Runwaylover 2687 Transparent 2024 Ladies Sexy Flare Sleeve Printed Blouse

Product Description

Runwaylover 2687 Transparent 2024 Ladies Sexy Flare Sleeve Printed Blouse
Size Guide & Visual Details
Shipping Method and Time
Shipping Method and Delivery Time Schedule
Frequently Asked Questions
1. Are samples available before placing a bulk order?

Yes, we provide samples before bulk orders! When you proceed to place the bulk order, the sample fee will be refunded.

2. Do you provide OEM, Label, and Tag services?

Yes, we provide high-quality clothing for OEM services. If you have your own design, we can create a sample for you that is 99.99% exactly like the original design.

3. How do you handle tags and labels?

If you already have your physical tags and labels, please send them to us and we can sew them on for free. If you only have the design files for the labels and tags, we can produce them for you.

4. What sizing system do you use? Are your sizes equivalent to European sizes?

Please refer to the size chart image provided above to check exact measurements. Generally, our sizes run smaller than standard European sizes.

5. Do you support drop shipping?

Yes, we support drop shipping. If you have your own shipping account, you can provide it to us. If not, we can arrange shipping via our shipping agent.

6. Where can I find shipping methods and transit times?

Detailed shipping methods and delivery transit times are listed directly in the shipping schedule chart shown above.

Related Products